The Northern New Town of Changzhou is about 73 km2. The project area located in the center of Northern New Town and covers of 1.6 km2 area. The high-speed railway runs through the middle of the site. In order to keep the visual relationship between the high-speed railway station and the surrounding area, a south-north landscape axis is planned, with the design element of water. Except the functional connection to the city development axis, the planning of the site also considered the requirementof transfer between the different
transports, like High-speed railway, metro, long distance bus, BRT, tram etc.. With the strategy of TOD, the urban space is more cooperated with the traffic transfer system and multi-functional use of underground space, and final formed a safe\convenient system.
Location: | 常州, China |
---|---|
Assignment type: | Competition |
Design Phases: | Existing analysis, urban design, functional planning, traffic planning, ecological planning, detail design. |
Type of project: | TOD |
Project duration: | 2011 |
Area: | 1600000 m² |